We were awarded the contract to fabricate and manufacture the mechanical parts including the scraper blades for the 2 new Primer settlement tank bridges for Thames water at longreach by ERIKS
This £400,000 project has been progressing through the work shop for 7 months as this was made in 3 sections for transport they were bolted together in our work shop and bridges electrical and Erik’s finished their work in our workshop to reduce any site risks, we have worked in a close partnership with ERIKS who supplied all of the bought in item gearboxes bearings etc. They also assembled the units on site. The whole project was done to CE exc 2.
G&P Engineering has evolved from a very modest beginning in 1980 operating from the proverbial “back of a van” to bespoke built workshops, catering for all types of fabrication, machining and engineering.