Projects

G&P won a contract to manufacture and install a maintenance platform to span between two conveyors, to reduce the need for scaffolding and negate the risk of slips, trips and falls.


G&P were contracted to remove, overhaul and reinstall four lock gates from East London. This involved removal of the lock gates by way of a large crane, shot-blasting the lock gates, replacement of..

G&P were contracted to remove, remanufacture and reinstall Picket Fence Thickener (PFT) No. 4 at Beckton Sewage Treatment Works (STW). The Picket Fence Thickeners are part of the sludge thickening stage of..

G&P were contracted to overhaul a 5’ nominal bore axial-flow impounding pump for a client in London. The work scope included replacement of bearings, line bushes, and seals; one of the line bushes showed cracks in the..

G&P were awarded the contract for the overhaul of seven conveyors during a limited-time outage in May of 2022.
G&P supplied 16 operatives to work..


A local metal recycling company purchased a ring crusher to repurpose for their site, but some modifications and refurbishment were required. G&P were requested to modify, recondition and..

We were awarded the contract to fabricate and manufacture the mechanical parts including the scraper blades for the 2 new Primer settlement tank bridges for Thames water at longreach by ERIKS..
G&P were awarded the contract for the overhaul of seven conveyors during a limited-time outage in May of 2022.
G&P supplied 16 operatives to work..
